vize:croquis/cf/deep-import
An import chain is deeper than the project allows.
Default severity: Not emitted
Applies to: Analyzed component graph and the supported facts described below
Automatic fix: None; review related files and apply the repair
Options: No per-code options; supported CLI findings accept severity overrides
This is a published diagnostic contract without a current producer. The Bad/Good scenario below explains the risk and repair; no flag currently makes this code trigger.
This is an explicitly chosen project layout policy; it does not invent a supported depth threshold or option. There is no current diagnostic producer for this contract.
Shared project files
Use these unchanged files in both Bad and Good. Install the imported packages in the project: Vue, plus vue-router or Pinia where shown. Follow any version-specific support note. The entry root makes the component relationship explicit.
main.ts
import { createApp } from 'vue';
import App from './App.vue';
createApp(App).mount('#app');
index.html
<!doctype html>
<html lang="en"><head><meta charset="UTF-8"><title>Contract scenario</title></head>
<body><div id="app"></div><script type="module" src="/main.ts"></script></body></html>
App.vue
<script setup lang="ts">
import { label } from './entry';
</script>
<template>
<p>{{ label }}</p>
</template>
value.ts
export const label = 'Notice';
level-one.ts
export { label } from './level-two';
level-two.ts
export { label } from './level-three';
level-three.ts
export { label } from './value';
public-api.ts
export { label } from './value';
Bad
The entry routes a simple value through level-one, level-two, and level-three, creating an unnecessarily deep import chain for a project that wants a shallow public boundary.
entry.ts
export { label } from './level-one';
Good
The entry uses public-api.ts, which re-exports the value directly. The consumer keeps the same imported name while the chain becomes shorter.
entry.ts
export { label } from './public-api';